DMADV stands for :

OPTIONS Design, Measure, Analyze, Develop, Verify Develop Measurement and Analysis Department for Verification Define, Measure, Analyze, Design, Verify Design, Measure, Analyze, Define, Validate ANSWER Define, Measure, Analyze, Design, Verify EXPLANATION DMADV is Six Sigma methodology that is used when developing a new process. It stands...
Read More

Six Sigma Level can be achieved by having:

OPTIONS less than 3.4 defects per million opportunities. six times better quality than competitors. six levels of testing and validation before release. Six Nines Quality (99.9999%). ANSWER Less than 3.4 defects per million opportunities EXPLANATION If your process is delivering less than 3.4 defects per...
Read More

DFSS stands for:

OPTIONS Design and Fix using Six Sigma Develop Fast using Six Sigma Define Futuristic Service and Solutions Design For Six Sigma ANSWER Design For Six Sigma EXPLANATION DFSS is Six Sigma methodology that stands for “Design for Six Sigma” used while designing new processes.
Read More

DMAIC stands for:

OPTIONS Design, Measure, Analyze, Improve, Control Define, Measure, Analyze, Improve, Control Double Measurement And Instructions Checklist Definition, Measurements, Analysis, Improvements, and Control ANSWER Define, Measure, Analyze, Improve, Contro EXPLANATION DMAIC is a Six Sigma problem solving methodology that stands for Define, Measure, Analyze, Improve, and...
Read More

What is Six Sigma?

OPTIONS A business philosophy focusing on improvement A project management model A defects reduction technique that is six times better than average A measurement system ANSWER A business philosophy focusing on improvement EXPLANATION Six Sigma is a business philosophy focused on driving continuous and breakthrough...
Read More

The purpose of Six Sigma is to:

OPTIONS fix defects. reduce variation. perform project management. calculate standard deviation. ANSWER Reduce variation EXPLANATION The purpose of Six Sigma is to reduce variation from any process and product. As variation is reduced, the quality is increased.
Read More

The main reason of preferring an Individuals over an Averages charts is

OPTIONS Need to collect lesser samples Process shifts detected easily Additional sensitivity by averages charts not justified Process drifts detected easily ANSWER Additional sensitivity by averages charts not justified EXPLANATION Individuals charts are not sensitive to special causes, so THE THIRD OPTION is correct.