If your project Y is measured as an Attribute Data, what should the Black Belt do?
OPTIONS
Work with the attribute dataConvert attribute to continuous dataConvert attribute to discrete dataRe-measure the data
ANSWER
Work with the attribute data
EXPLANATION
A lot of Black Belts like to work with Continuous Data. That said, having the Project Y as attribute doesn’t mean the Black Belt should convert this to any other type.